* do not include patch releases in the release schedule
* fix the Gitea compatibility of 7.0 & 8.0
* change the feature freeze from two to three weeks. See
* https://codeberg.org/forgejo/discussions/issues/180
* https://codeberg.org/forgejo/discussions/issues/187
* remove cutting a release in favor of copy/pasting previous
checklists
* remove release notes as it is not done on a rolling basis
* move the runner publication down as it was in the middle
of the release process sections
* reminder of LTS toolchain upgrades
- add a checklist to the release instructions
- use a pattern for push instead of an explicit list of branches
it was previously advisable to avoid conflicts when there was
no automated backports but it is no longer necessary
Per "request" of @0ko in https://codeberg.org/forgejo/forgejo/pulls/3270#issuecomment-1774032
TODOs
- postponed: how to add codespell (written in Python) to CI -- separate workflow? add to some other step? to some other tool/specification?
Reviewed-on: https://codeberg.org/forgejo/docs/pulls/536
Reviewed-by: Earl Warren <earl-warren@noreply.codeberg.org>
Co-authored-by: Yaroslav Halchenko <debian@onerussian.com>
Co-committed-by: Yaroslav Halchenko <debian@onerussian.com>
- LTS are listed in the table, no hint in the version number
- update the RC release names
- CLI updates
Reviewed-on: https://codeberg.org/forgejo/docs/pulls/561
Co-authored-by: Earl Warren <contact@earl-warren.org>
Co-committed-by: Earl Warren <contact@earl-warren.org>
* Release number is v7.0.0+1.22.0 and following semantic versioning
* Remove the workflow page which is no longer needed as:
* it is implicitly understood pull requests go to the default branch
* testing requirements are documented in the testing.md page
* Explain how to cut a release and set the tag in forgejo-integration
for proper numbering of the test releases that come out of the
development branch
Refs: https://codeberg.org/forgejo/forgejo/pulls/2448